Новости стали

Мы стремимся сделать вас на шаг впереди рынка.

Barrick Gold to accelerate project expansion at Lumwana copper mine

25 янв 2024 14:39 reported by Joy Liu

A A A
Barrick Gold Corp., the world’s leading gold and copper producer, planned to accelerate the expansion at its Lumwana copper mine in Zambia, aiming to start the first production in 2028.

According to the expansion project, Barrick Gold targeted to transform the Lumwana copper mine into one of the world’s largest copper mines, raising the annual production capacity to 240,000 tons within its life of more than 30 years.

With an estimated cost of nearly US$2 billion, the construction was scheduled to begin by the end of this year, and a comprehensive feasibility study would also be carried out by the year-end.

Вернуться к Новости стали

Связанные новости

BHP withdraws takeover bid for Anglo-American

  • Raw material
  • 30 май 2024 16:04

China's copper supply still abundant even with global copper shortage

  • Raw material
  • 30 май 2024 15:49

Forrestania Resources secures option agreement to acquire Netley Minerals iron ore

  • Raw material
  • 30 май 2024 15:49

ArcelorMittal Liberia constructing cutting-edge iron ore concentration plant

  • Raw material
  • 28 май 2024 15:53

Raw material supply to RINL resumes after month-long port worker strike

  • Raw material
  • 28 май 2024 15:45

Индекс цен на металлы

Узнать больше

Официальная цена предложения LME

  • Цинк
  • 3 059,00
  • 3 116,00
  • Алюминий
  • 2 694,00
  • 2 740,00
  • Медь
  • 10 292,00
  • 10 429,00
  • Никель
  • 20 250,00
  • 20 560,00

Узнать больше

Центр обмена рулонах

  • 2B Coil-июн
  • 2 660
  • 2 520
  • NO1 Coil-июн
  • 2 630
  • 2 490
  • 2B Coil-июн
  • 2 660
  • 2 520
  • NO1 Coil-июн
  • 2 630
  • 2 490

Узнать больше